1967

Sources:

1 http://www.collectspace.com/resources/tindallgrams/tindallgrams01.pdf
2 http://www.collectspace.com/resources/tindallgrams/tindallgrams02.pdf
3 http://www.collectspace.com/resources/tindallgrams/1967_tindallgrams.pdf
4 http://www.collectspace.com/resources/tindallgrams/1968_tindallgrams.pdf
5 http://www.collectspace.com/resources/tindallgrams/1969_tindallgrams.pdf
6 http://www.collectspace.com/resources/tindallgrams/1970_tindallgrams.pdf
7 http://web.mit.edu/digitalapollo/Documents/Chapter7/tindallgrams.pdf
Serial # Date Subject Sources
67-FM1-1 Jan 9 1967 Uplink will be on LM-4 2
67-FM1-2 Jan 9 1967 Proceedures needed for the AS-503 TLI maneuver 3
67-FM1-3 Jan 9 1967 Rope manufacture for AS-502 2, 3
67-FM1-4 Jan 10 1967 No special spacecraft computer programs are to be developed for AS-208B and AS-503 2, 3
67-FM1-5 Jan 10 1967 Significant modifications currently planned in the Apollo Spacecraft Computer Programs 2, 3
67-FM1-6 Jan 13 1967 AS-504 Spacecraft Computer Programs will be able to support earth orbital and lunar missions 3
67-FM1-7 Jan ?? 1967 Why is it everyone who likes radar wears a white hat? 3
67-FM1-8 Jan 23 1967 Justification for SCAMA circuit to MIT/Boston 3
67-FM1-9 Jan 23 1967 Latest on the AS-206 spacecraft computer program 2, 3
67-FM1-10 Jan 23 1967 AS-504 spacecraft computer program and storage status. Also a dash of AS-258 3
67-FM1-11 Jan 25 1967 More about computer self-check 3
67-FM1-12 Jan 25 1967 Why does the AAP command module need a sextant? 3
67-FM1-13 Jan 25 1967 AGS Software Documentation 3
67-FM1-14 Jan 30 1967 Data for postflight analysis of the DAP 3
67-FM1-15 Jan 30 1967 Program interlocks - farewell 3
67-FM1-16 Jan 30 1967 AAP platform should be torqued to local horizontal 3
67-FM1-17 Jan 31 1967 AS-206 Spacecraft Computer Program Newsletter 2, 3
67-FM1-18 Feb 3 1967 Spacecraft Computer Program Development Newsletter 3
67-FM1-19 Mar 2 1967 Progress Report - RTCC program development reduction - Review of requirements for AS-502 mission 3
67-FM1-20 Feb 23 1967 Star/landmark navigation exercise preflight planning 3
67-FM1-21 ? ?? 1967 Service Module RCS propellant remaining calculations in the CMC 3
67-FM1-22 Mar 20 1967 AS-258 RTCC Retrofire Time Computation 3
67-FM1-23 Mar 23 1967 Summary of what needs to be done to develop flight confidence in the spacecraft computer programs 3
67-FM1-24 Mar 24 1967 In which is described the Apollo spacecraft computer programs currently being developed 3, 7
67-FM1-25 Mar 27 1967 None 3
67-FM1-26 Mar 28 1967 Progress Report - RTCC program development - Review of AS-258(!) requirements 3
67-FM1-27 Mar 30 1967 Current plans for downlink of LM radar data 3
67-FM1-28 Apr 3 1967 LM S-band antenna boresight change presents no LGC problem 3
67-FM1-29 Apr 3 1967 Interim progress report - RTCC program development - AS-258(!) Ground Support Simulations Computer [GSSC] programs 3
67-FM1-30 Apr 18 1967 Proceed button 3
67-FM1-32 Apr 21 1967 Descent engine gimbal polarity error 3
67-FM1-33 Apr 2? 1967 MIT's digital computer facilities are still a problem 3
67-FM1-34 Apr 23 1967 Computer program requirements for AAP 3
67-FM1-35 Apr 23 1967 Notes from the MIT program development plan meeting of April 20 3
67-FM1-36 May 4 1967 Some things Mr. Copps is worried about 3
67-FM1-37 May 4 1967 Invitation to an AAP spacecraft computer program requirements shindig 3
67-FM1-38 May 17 1967 Reduced L/D presents a spacecraft computer program problem 3, 7
67-FM1-39 May 17 1967 A new spacecraft computer program development working philosophy is taking shape 1, 3, 7
67-FM-T-40 May 12 1967 MIT can handle spacecraft computer program development for both Apollo and AAP to their mutual advantage 3
67-FM-T-41 May 23 1967 Spacecraft computer program names 2, 3, 7
67-FM-T-43 Jul 26 1967 LM is launched with air 3
67-FM-T-44 Jul 26 1967 Notes from ASPO Manager's staff meeting - July 24 3
67-FM-T-45 Jul 27 1967 Spacecraft computer program flow chart status 3
67-FM-T-46 Jul 27 1967 Landing point dispersion given communication loss in lunar orbit 3
67-FM-T-47 Jul 27 1967 LMSS RTCC program test documentation needed 3
67-FM-T-48 Jul 27 1967 Configuration control of the spacecraft computer programs for 504 is imminent 3
67-FM-T-49 Jul 27 1967 There will be no S-IVB ephemeris in teh RTCC after separation 3
67-FM-T-50 Jul 27 1967 Greater dispersion at entry on AS-501 with the new IMI 3
67-FM-T-51 Jul 31 1967 We're gonna' find out if the PAC is a good substitute for the flight ropes 3
67-FM-T-52 Aug 1 1967 Spacecraft computer program status - particularly Sundisk 3
67-FM-T-53 Jul 31 1967 Spacecraft computer storage requirement for restart protection 3
67-FM-T-54 Aug 3 1967 Verify Sundisk for CSM/LM missions 3
67-FM-T-55 Aug 8 1967 Deep serious trouble 3
67-FM-T-56 Aug 3 1967 Inflight loading of the spacecraft computer erasable memory 3
67-FM-T-57 Aug 8 1967 Do y'all need the MIT hybrid facilities for crew training? 3
67-FM-T-58 Aug 8 1967 VHF ranging by CSM for ascent monitoring 3
67-FM-T-59 Aug 8 1967 MPAD contractual effort provided FSD for software verification 3
67-FM-T-60 Aug 14 1967 Crew monitoring of the LOI maneuver 2, 3
67-FM-T-61 Aug 14 1967 New/old platform for AS-501 3
67-FM-T-62 Aug 18 1967 A new rope module for LM-1 computer 3
67-FM-T-63 Aug 24 1967 Use of DPS for lunar mission aborts 3
67-FM-T-64 Aug 25 1967 Reentry guidance is perfect for S/C 101 regardless of L/D 3
67-FM-T-65 Aug 28 1967 Delete DOI thrust program, P-61 3
67-FM-T-66 Aug 28 1967 Prelaunch DAP initialization 3
67-FM-T-67 Aug 28 1967 Is display of max g in P-61 any good? 3
67-FM-T-68 Aug 28 1967 Goodies affecting the RTCC gleaned from the 504 GSOP meeting 3
67-FM-T-69 Aug 23 1967 Head up and locked DAP-wise 3
67-FM-T-70 Aug 28 1967 Does the landing radar mess us up? 3
67-FM-T-71 Aug 28 1967 Analysis of LM rendezvous navigation is needed 3
67-FM-T-72 Aug 29 1967 Inflight loading of the spacecraft computer erasable memory 3
67-FM-T-73 Aug 29 1967 Apparently S/C 103 may fly one month after S/C 101 3
67-FM-T-74 Aug 29 1967 Maneuver sensitivity coefficients 3
67-FM-T-75 Sep 6 1967 LM spacecraft assignments 3
67-PA-T-76A Sep 7 1967 Another meeting about trajectory control on the first manned Apollo mission (S/C 101) 3
67-FM-T-77 Sep 7 1967 How do we get and use LM rendezvous radar observations? 3
67-FM-T-78 Sep 11 1967 Mission Rule for TPI - ground or onboard 3
67-PA-T-79A Sep 11 1967 Data Priority Coordination - a plea for help 3
67-FM-T-80 Oct 11 1967 It's SUNDISK for Spacecraft 103 3, 7
67-FM1-81 Oct ?? 1967 About frequency of LM radar observations 7
67-FM1-82 ?? (unreadable) 3
67-FM-T-83 Oct 17 1967 Spacecraft computer program status 3, 7
67-FM-T-84 Oct 18 1967 There will be no manual input of range ?? capability in spacecraft rendezvous ?? 3
67-FM-T-85 Oct 18 1967 Spacecraft computer program development improvements to be utilized by MIT 1, 3, 7
67-FM-T-86 Oct 18 1967 Some things about the Descent Propulsion System as controlled by the LOC 3
67-PA-T-87A Oct 19 1967 First meeting of the Descent Phase Mission Techniques Working Group 3
67-PA-T-88A Oct 19 1967 First meeting of the Descent Phase Mission Techniques Working Group 3
67-FM-T-89 Oct 19 1967 K-chart tape briefing 3
67-PA-T-90A Oct 19 1967 Descent phase to be added to your Apollo Mission Techniques Document 3
67-PA-T-92A Oct 19 1967 Descent phase to be added to your Apollo Mission Techniques Document 3
67-PA-T-93A Oct 19 1967 Descent phase to be added to your Apollo Mission Techniques Document 3
67-PA-T-94A Oct 19 1967 Descent phase to be added to your Apollo Mission Techniques Document 3
67-FM-T-95 Oct 20 1967 More about LM radar rendezvous data processing 3
67-FM-T-96 Oct 24 1967 Immediate rstart of the SPS engine under PGNCS control 3
67-FM-T-97 Oct 26 1967 Core rope simulator certification 3
67-FM-T-98 Oct 27 1967 Let's find out if current MCFM performance is really not good enough for lunar operations 3
67-PA-T-99A Oct 30 1967 Current status on the LM DPS engine gimbal caution light problem 3
67-FM-T-100 Oct 30 1967 Final word on the targeting of the externally targeted prethrust spacecraft computer programs 3
67-FM-T-101 Nov 8 1967 What is the effect of uncertainty in the lunar potential on spacecraft computer program performance? 3
67-FM-T-102 Nov 8 1967 Spacecraft computer program F05---on the way out 3
67-FM-T-103 Nov 9 1967 MIT/MSC review of LUMINARY Descent Programs 3
67-FM-T-104 Nov 14 1967 Spacecraft computer program design to process VMP ranging for rendezvous navigation 3
67-FM-T-105 Nov 14 1967 Inflight alignment of the COAS 3
67-FM-T-106 Nov 14 1967 EMS software verification doesn't exist 3
67-PA-T-107A Nov 27 1967 Some Assumptions about Spacecraft 101 retrofire and reentry procedures 3
67-FM-T-108 Nov 16 1967 501/502 state vector update requirement 3
67-FM-T-109 Nov 17 1967 Spacecraft computer program orbital integration 2, 3
67-PA-T-110A Dec 4 1967 Third Trajectory Control Data Priority Meeting for Spacecraft 101 3
67-FM-T-111 Dec 7 1967 Light weight attitude control is too sporty 3
67-PA-T-115A Dec 15 1967 Urgent recommendation that CMC steering of the S-IVB be deleted 3
67-PA-T-116A Dec 11 1967 Establishment of the Midcourse Phase Mission Techniques Working GRoup 3
67-PA-T-117A Dec 11 1967 Apollo 205/101 reentry procedures 3
67-PM-T-118A Dec 18 1967 No need to perform lunar landmark orbit determination 3
67-FM-T-119 Dec 14 1967 Extra cost of boresight TFI 3
67-PM-T-120A Dec 14 1967 Mission C DAP initialization procedures 3
67-PM-T-121A Dec 15 1967 It is proposed that we plan a two step LOI maneuver 3
67-FM-T-122 Dec 15 1967 Some lunar landmark tracking questions 3
67-FM-T-123 Dec 15 1967 Can MSFN figure out where the LM is on the moon's surface? 3
67-FM-T-124 Dec 18 1967 Spacecraft computer program newsletter 3
67-FM-T-125 Dec 18 1967 Do you want a program to calibrate the COAS? 3
67-PA-T-126A Dec 18 1967 Third Trajectory Control Data Priority Meeting for Spacecraft 101 3
67-PA-T-128A Dec 26 1967 Lunar lift off shall be planned at discrete times only 3
67-PA-T-129A Dec 26 1967 Rendezvous meeting reminder 3
67-PA-T-127A Dec 27 1967 LM rendezvous radar during Ascent is about to go over the brink 3