Sources:
Serial # | Date | Subject | Sources |
---|---|---|---|
67-FM1-1 | Jan 9 1967 | Uplink will be on LM-4 | 2 |
67-FM1-2 | Jan 9 1967 | Proceedures needed for the AS-503 TLI maneuver | 3 |
67-FM1-3 | Jan 9 1967 | Rope manufacture for AS-502 | 2, 3 |
67-FM1-4 | Jan 10 1967 | No special spacecraft computer programs are to be developed for AS-208B and AS-503 | 2, 3 |
67-FM1-5 | Jan 10 1967 | Significant modifications currently planned in the Apollo Spacecraft Computer Programs | 2, 3 |
67-FM1-6 | Jan 13 1967 | AS-504 Spacecraft Computer Programs will be able to support earth orbital and lunar missions | 3 |
67-FM1-7 | Jan ?? 1967 | Why is it everyone who likes radar wears a white hat? | 3 |
67-FM1-8 | Jan 23 1967 | Justification for SCAMA circuit to MIT/Boston | 3 |
67-FM1-9 | Jan 23 1967 | Latest on the AS-206 spacecraft computer program | 2, 3 |
67-FM1-10 | Jan 23 1967 | AS-504 spacecraft computer program and storage status. Also a dash of AS-258 | 3 |
67-FM1-11 | Jan 25 1967 | More about computer self-check | 3 |
67-FM1-12 | Jan 25 1967 | Why does the AAP command module need a sextant? | 3 |
67-FM1-13 | Jan 25 1967 | AGS Software Documentation | 3 |
67-FM1-14 | Jan 30 1967 | Data for postflight analysis of the DAP | 3 |
67-FM1-15 | Jan 30 1967 | Program interlocks - farewell | 3 |
67-FM1-16 | Jan 30 1967 | AAP platform should be torqued to local horizontal | 3 |
67-FM1-17 | Jan 31 1967 | AS-206 Spacecraft Computer Program Newsletter | 2, 3 |
67-FM1-18 | Feb 3 1967 | Spacecraft Computer Program Development Newsletter | 3 |
67-FM1-19 | Mar 2 1967 | Progress Report - RTCC program development reduction - Review of requirements for AS-502 mission | 3 |
67-FM1-20 | Feb 23 1967 | Star/landmark navigation exercise preflight planning | 3 |
67-FM1-21 | ? ?? 1967 | Service Module RCS propellant remaining calculations in the CMC | 3 |
67-FM1-22 | Mar 20 1967 | AS-258 RTCC Retrofire Time Computation | 3 |
67-FM1-23 | Mar 23 1967 | Summary of what needs to be done to develop flight confidence in the spacecraft computer programs | 3 |
67-FM1-24 | Mar 24 1967 | In which is described the Apollo spacecraft computer programs currently being developed | 3, 7 |
67-FM1-25 | Mar 27 1967 | None | 3 |
67-FM1-26 | Mar 28 1967 | Progress Report - RTCC program development - Review of AS-258(!) requirements | 3 |
67-FM1-27 | Mar 30 1967 | Current plans for downlink of LM radar data | 3 |
67-FM1-28 | Apr 3 1967 | LM S-band antenna boresight change presents no LGC problem | 3 |
67-FM1-29 | Apr 3 1967 | Interim progress report - RTCC program development - AS-258(!) Ground Support Simulations Computer [GSSC] programs | 3 |
67-FM1-30 | Apr 18 1967 | Proceed button | 3 |
67-FM1-32 | Apr 21 1967 | Descent engine gimbal polarity error | 3 |
67-FM1-33 | Apr 2? 1967 | MIT's digital computer facilities are still a problem | 3 |
67-FM1-34 | Apr 23 1967 | Computer program requirements for AAP | 3 |
67-FM1-35 | Apr 23 1967 | Notes from the MIT program development plan meeting of April 20 | 3 |
67-FM1-36 | May 4 1967 | Some things Mr. Copps is worried about | 3 |
67-FM1-37 | May 4 1967 | Invitation to an AAP spacecraft computer program requirements shindig | 3 |
67-FM1-38 | May 17 1967 | Reduced L/D presents a spacecraft computer program problem | 3, 7 |
67-FM1-39 | May 17 1967 | A new spacecraft computer program development working philosophy is taking shape | 1, 3, 7 |
67-FM-T-40 | May 12 1967 | MIT can handle spacecraft computer program development for both Apollo and AAP to their mutual advantage | 3 |
67-FM-T-41 | May 23 1967 | Spacecraft computer program names | 2, 3, 7 |
67-FM-T-43 | Jul 26 1967 | LM is launched with air | 3 |
67-FM-T-44 | Jul 26 1967 | Notes from ASPO Manager's staff meeting - July 24 | 3 |
67-FM-T-45 | Jul 27 1967 | Spacecraft computer program flow chart status | 3 |
67-FM-T-46 | Jul 27 1967 | Landing point dispersion given communication loss in lunar orbit | 3 |
67-FM-T-47 | Jul 27 1967 | LMSS RTCC program test documentation needed | 3 |
67-FM-T-48 | Jul 27 1967 | Configuration control of the spacecraft computer programs for 504 is imminent | 3 |
67-FM-T-49 | Jul 27 1967 | There will be no S-IVB ephemeris in teh RTCC after separation | 3 |
67-FM-T-50 | Jul 27 1967 | Greater dispersion at entry on AS-501 with the new IMI | 3 |
67-FM-T-51 | Jul 31 1967 | We're gonna' find out if the PAC is a good substitute for the flight ropes | 3 |
67-FM-T-52 | Aug 1 1967 | Spacecraft computer program status - particularly Sundisk | 3 |
67-FM-T-53 | Jul 31 1967 | Spacecraft computer storage requirement for restart protection | 3 |
67-FM-T-54 | Aug 3 1967 | Verify Sundisk for CSM/LM missions | 3 |
67-FM-T-55 | Aug 8 1967 | Deep serious trouble | 3 |
67-FM-T-56 | Aug 3 1967 | Inflight loading of the spacecraft computer erasable memory | 3 |
67-FM-T-57 | Aug 8 1967 | Do y'all need the MIT hybrid facilities for crew training? | 3 |
67-FM-T-58 | Aug 8 1967 | VHF ranging by CSM for ascent monitoring | 3 |
67-FM-T-59 | Aug 8 1967 | MPAD contractual effort provided FSD for software verification | 3 |
67-FM-T-60 | Aug 14 1967 | Crew monitoring of the LOI maneuver | 2, 3 |
67-FM-T-61 | Aug 14 1967 | New/old platform for AS-501 | 3 |
67-FM-T-62 | Aug 18 1967 | A new rope module for LM-1 computer | 3 |
67-FM-T-63 | Aug 24 1967 | Use of DPS for lunar mission aborts | 3 |
67-FM-T-64 | Aug 25 1967 | Reentry guidance is perfect for S/C 101 regardless of L/D | 3 |
67-FM-T-65 | Aug 28 1967 | Delete DOI thrust program, P-61 | 3 |
67-FM-T-66 | Aug 28 1967 | Prelaunch DAP initialization | 3 |
67-FM-T-67 | Aug 28 1967 | Is display of max g in P-61 any good? | 3 |
67-FM-T-68 | Aug 28 1967 | Goodies affecting the RTCC gleaned from the 504 GSOP meeting | 3 |
67-FM-T-69 | Aug 23 1967 | Head up and locked DAP-wise | 3 |
67-FM-T-70 | Aug 28 1967 | Does the landing radar mess us up? | 3 |
67-FM-T-71 | Aug 28 1967 | Analysis of LM rendezvous navigation is needed | 3 |
67-FM-T-72 | Aug 29 1967 | Inflight loading of the spacecraft computer erasable memory | 3 |
67-FM-T-73 | Aug 29 1967 | Apparently S/C 103 may fly one month after S/C 101 | 3 |
67-FM-T-74 | Aug 29 1967 | Maneuver sensitivity coefficients | 3 |
67-FM-T-75 | Sep 6 1967 | LM spacecraft assignments | 3 |
67-PA-T-76A | Sep 7 1967 | Another meeting about trajectory control on the first manned Apollo mission (S/C 101) | 3 |
67-FM-T-77 | Sep 7 1967 | How do we get and use LM rendezvous radar observations? | 3 |
67-FM-T-78 | Sep 11 1967 | Mission Rule for TPI - ground or onboard | 3 |
67-PA-T-79A | Sep 11 1967 | Data Priority Coordination - a plea for help | 3 |
67-FM-T-80 | Oct 11 1967 | It's SUNDISK for Spacecraft 103 | 3, 7 |
67-FM1-81 | Oct ?? 1967 | About frequency of LM radar observations | 7 |
67-FM1-82 | ?? | (unreadable) | 3 |
67-FM-T-83 | Oct 17 1967 | Spacecraft computer program status | 3, 7 |
67-FM-T-84 | Oct 18 1967 | There will be no manual input of range ?? capability in spacecraft rendezvous ?? | 3 |
67-FM-T-85 | Oct 18 1967 | Spacecraft computer program development improvements to be utilized by MIT | 1, 3, 7 |
67-FM-T-86 | Oct 18 1967 | Some things about the Descent Propulsion System as controlled by the LOC | 3 |
67-PA-T-87A | Oct 19 1967 | First meeting of the Descent Phase Mission Techniques Working Group | 3 |
67-PA-T-88A | Oct 19 1967 | First meeting of the Descent Phase Mission Techniques Working Group | 3 |
67-FM-T-89 | Oct 19 1967 | K-chart tape briefing | 3 |
67-PA-T-90A | Oct 19 1967 | Descent phase to be added to your Apollo Mission Techniques Document | 3 |
67-PA-T-92A | Oct 19 1967 | Descent phase to be added to your Apollo Mission Techniques Document | 3 |
67-PA-T-93A | Oct 19 1967 | Descent phase to be added to your Apollo Mission Techniques Document | 3 |
67-PA-T-94A | Oct 19 1967 | Descent phase to be added to your Apollo Mission Techniques Document | 3 |
67-FM-T-95 | Oct 20 1967 | More about LM radar rendezvous data processing | 3 |
67-FM-T-96 | Oct 24 1967 | Immediate rstart of the SPS engine under PGNCS control | 3 |
67-FM-T-97 | Oct 26 1967 | Core rope simulator certification | 3 |
67-FM-T-98 | Oct 27 1967 | Let's find out if current MCFM performance is really not good enough for lunar operations | 3 |
67-PA-T-99A | Oct 30 1967 | Current status on the LM DPS engine gimbal caution light problem | 3 |
67-FM-T-100 | Oct 30 1967 | Final word on the targeting of the externally targeted prethrust spacecraft computer programs | 3 |
67-FM-T-101 | Nov 8 1967 | What is the effect of uncertainty in the lunar potential on spacecraft computer program performance? | 3 |
67-FM-T-102 | Nov 8 1967 | Spacecraft computer program F05---on the way out | 3 |
67-FM-T-103 | Nov 9 1967 | MIT/MSC review of LUMINARY Descent Programs | 3 |
67-FM-T-104 | Nov 14 1967 | Spacecraft computer program design to process VMP ranging for rendezvous navigation | 3 |
67-FM-T-105 | Nov 14 1967 | Inflight alignment of the COAS | 3 |
67-FM-T-106 | Nov 14 1967 | EMS software verification doesn't exist | 3 |
67-PA-T-107A | Nov 27 1967 | Some Assumptions about Spacecraft 101 retrofire and reentry procedures | 3 |
67-FM-T-108 | Nov 16 1967 | 501/502 state vector update requirement | 3 |
67-FM-T-109 | Nov 17 1967 | Spacecraft computer program orbital integration | 2, 3 |
67-PA-T-110A | Dec 4 1967 | Third Trajectory Control Data Priority Meeting for Spacecraft 101 | 3 |
67-FM-T-111 | Dec 7 1967 | Light weight attitude control is too sporty | 3 |
67-PA-T-115A | Dec 15 1967 | Urgent recommendation that CMC steering of the S-IVB be deleted | 3 |
67-PA-T-116A | Dec 11 1967 | Establishment of the Midcourse Phase Mission Techniques Working GRoup | 3 |
67-PA-T-117A | Dec 11 1967 | Apollo 205/101 reentry procedures | 3 |
67-PM-T-118A | Dec 18 1967 | No need to perform lunar landmark orbit determination | 3 |
67-FM-T-119 | Dec 14 1967 | Extra cost of boresight TFI | 3 |
67-PM-T-120A | Dec 14 1967 | Mission C DAP initialization procedures | 3 |
67-PM-T-121A | Dec 15 1967 | It is proposed that we plan a two step LOI maneuver | 3 |
67-FM-T-122 | Dec 15 1967 | Some lunar landmark tracking questions | 3 |
67-FM-T-123 | Dec 15 1967 | Can MSFN figure out where the LM is on the moon's surface? | 3 |
67-FM-T-124 | Dec 18 1967 | Spacecraft computer program newsletter | 3 |
67-FM-T-125 | Dec 18 1967 | Do you want a program to calibrate the COAS? | 3 |
67-PA-T-126A | Dec 18 1967 | Third Trajectory Control Data Priority Meeting for Spacecraft 101 | 3 |
67-PA-T-128A | Dec 26 1967 | Lunar lift off shall be planned at discrete times only | 3 |
67-PA-T-129A | Dec 26 1967 | Rendezvous meeting reminder | 3 |
67-PA-T-127A | Dec 27 1967 | LM rendezvous radar during Ascent is about to go over the brink | 3 |